Logo Zweibau Construcciones

Select your language

Select your language

Redesign of the bathing area at Sandy Beach Hotel

Video- Sandy Beach
vogelperspektive_des_fertigen_pools_20171117_1752824540.jpg
wasserfall_fertiggestellt_20171117_1117616314.jpg
wasserfallanlage_in_betrieb_20171117_1411216775.jpg
previous arrowprevious arrow
next arrownext arrow

Video- Sandy Beach
vogelperspektive_des_fertigen_pools_20171117_1752824540.jpg
wasserfall_fertiggestellt_20171117_1117616314.jpg
wasserfallanlage_in_betrieb_20171117_1411216775.jpg
previous arrowprevious arrow
next arrownext arrow

The waterfall system, the showers and the outside areas were well embellished with natural stones, using different techniques.

Abtrennen der alten Fliesen für Wasserfall Landschaft
Abtrennen der alten Fliesen für Wasserfall Landschaft
Abriss der alten Verkleidung Vorbereitung zur Renovation
Abriss der alten Verkleidung Vorbereitung zur Renovation
Abtrennung alter Mosaikfliesen
Abtrennung alter Mosaikfliesen
Abtrennung alter Mosaik-Beschichtung
Abtrennung alter Mosaik-Beschichtung
Alte Mosaikfliesen lösen
Alte Mosaikfliesen lösen
Neues grünes Mosaik
Neues grünes Mosaik
Mosaik Beschichtung Sprudelliege
Mosaik Beschichtung Sprudelliege
Mosaik Verlegung - Anpassung auf Kante
Mosaik Verlegung - Anpassung auf Kante
Mosaik Übergang der Beckenwand
Mosaik Übergang der Beckenwand
previous arrow
next arrow
Abtrennen der alten Fliesen für Wasserfall Landschaft
Abriss der alten Verkleidung Vorbereitung zur Renovation
Abtrennung alter Mosaikfliesen
Abtrennung alter Mosaik-Beschichtung
Alte Mosaikfliesen lösen
Neues grünes Mosaik
Mosaik Beschichtung Sprudelliege
Mosaik Verlegung - Anpassung auf Kante
Mosaik Übergang der Beckenwand
previous arrow
next arrow


Due to the high occupancy of the hotel, the work was realised in record time (nights and weekend work).
After 25 calendar days, the Sandy Beach could offer the bathing fun for its visitors again.

Arbeitskontrolle vom Bauleiter
Arbeitskontrolle vom Bauleiter
Formgebung  des Natursteins für die Mauer
Formgebung des Natursteins für die Mauer
Naturstein Verkleidung der Mauer
Naturstein Verkleidung der Mauer
Fast fertiggestellt  Die neue Beckenverkleidung nahezu vollendet
Fast fertiggestellt Die neue Beckenverkleidung nahezu vollendet
Dusche vor Natursteinmauer auf Mosaikboden
Dusche vor Natursteinmauer auf Mosaikboden
Naturstein in verschiedenen Mustern verlegt.
Naturstein in verschiedenen Mustern verlegt.
Wasserfallanlage in Betrieb
Wasserfallanlage in Betrieb
Sprudelliegen Mosaik
Sprudelliegen Mosaik
Sprudelliege unter Wasser
Sprudelliege unter Wasser
previous arrow
next arrow
Arbeitskontrolle vom Bauleiter
Formgebung des Natursteins für die Mauer
Naturstein Verkleidung der Mauer
Fast fertiggestellt Die neue Beckenverkleidung nahezu vollendet
Dusche vor Natursteinmauer auf Mosaikboden
Naturstein in verschiedenen Mustern verlegt.
Wasserfallanlage in Betrieb
Sprudelliegen Mosaik
Sprudelliege unter Wasser
previous arrow
next arrow

Renovation of a tower in Bahía Feliz
Renovation of a tower in Bahía Feliz

Renovation of a building with a form of a tower

Construction of a billard hall
Construction of a billard hall

From the shell to the completition

Building of a house in El Hornillo
Building of a house in El Hornillo

Building of a huge villa

Exterior areas in Salobre
Exterior areas in Salobre

Redisign of the exterior areas

Renovation in El Hornillo
Renovation in El Hornillo

Redesign of the interior and exterior surfaces

Bar "Qué tal" in Las Palmas
Bar "Qué tal" in Las Palmas

Interior design of a theme restaurant 
 

Renovation of old buildings in Tafira
Renovation of old buildings in Tafira

A dilapidated "ruin" has been lovingly restored

Conversion of an apartment
Conversion of an apartment

Repairs of an apartment

Family adventure garden
Family adventure garden

In the south of GC we created a garden with an amazing water-landscape:

Two big pools with glass tiles at the five stars hotel Palm Beach in record time!
Two big pools with glass tiles at the five stars hotel Palm Beach in record time!

Once again ZWEIBAU CONSTRUCCIONES restored completely two huge pools with finest mosaic tiles in just 22 days.

First ecological pool on Gran Canaria
First ecological pool on Gran Canaria

2BAU ACUATICA constructed the first completely ecological pool on Gran Canaria.

New design of a 380m2 pool with glass tiles in a hotel resort
New design of a 380m2 pool with glass tiles in a hotel resort

New design of a 380m2 pool in a hotel resort with detailed work at rounded shapes.

Pool with waterfall and cave
Pool with waterfall and cave

Design of the outside area of a house in El Hornillo with cascade, biological channel, pool, pergola, swing, paths, outside lighting and roof renovation.

Reformation of a private pool with exclusive tiles
Reformation of a private pool with exclusive tiles

Complete reformation of a private pool with exclusive large size tiles. A shallow water platform was integrated into the stairs.

previous arrow
next arrow

Realized projects

About us
about us

We started our construction company in 2005 and since then we have reached a very large customer base.

Detlef Dietel, born in 1962, is master bricklayer and a building technician. Both qualifications were received in Karlsruhe/Germany. Besides all the works to do with bricklaying he specialized in everything to do with water (pools, waterfalls and more...).

Thanks to our qualified team we can also realize difficult construction sites with all the neccesary professionalism.

We guarantee quality

From all the different criteria the most important one for us is the satisfaction of the client. This we can achieve only by a long term high quality. We guarantee that by the following critera:

  1. our own qualification
  2. a skilled and experienced team
  3. planification and realization according to international standards
  4. daily control on the sites

Our partners

Zweibau Construcciones SLU · Paseo Pablo Picasso, 9 · E-35100 Bahía Feliz / Gran Canaria +34) 928 157 199 (+34) 653 192 331 info@2bau.es